Under the Occupational Health and Safety Regulations 2017, an employer or a person who manages or controls a workplace has a duty to ensure that all asbestos containing materials present in the building, which may be disturbed, are identified and removed prior to renovation or demolition works commencing.
If a current asbestos register is already in place and a Division 6 Audit is required for the same building before major works, it usually takes a fraction of the time and cost.
Australian Standard AS2601-2001 - The Demolition of Structures and Safework Australia Demolition Work Code of Practice October 2018 specifies the requirements for a hazardous materials audit to be undertaken prior to demolition and refurbishment work.
HAZCON's Division 6 Asbestos Audits generally include a Hazardous Building Materials Audit which will determine the presence of:
Other materials including ozone depleting substances, stored hazardous chemicals and biological hazards (mould and faecal contamination etc.) can also be included upon request within the scope of the audit.
All hazardous building materials (including asbestos containing materials) will then have to be removed prior to works on the building.
If you would like more information, advice or a quote for this service please Contact Us
Client Details Required
Building Details
Posted in:Ian Good |